Server Patches

We will be installing some patches on our VMWare hosts on Friday, March 11.  I will be taking some non-essential servers offline for a few hours.  

The following services will be offline during this time:

Timetracker http://timesheet.clawsons.com

Vibe https://vibe.clawsons.com

Toolbox Talks https://toolboxtalks.clawsons.com

WordPress https://employee.clawsons.com

Groupwise Mobility Server

Filr https://filr.clawsons.com

Filemaker https://filemaker.clawsons.com

Inflow Inventory


There may be additional server applications, if required, and we will notify users if necessary.
I will post an update when we are complete on our Employee Page, once that server is 
back online.

2022 1st Quarter Safety Meeting

Our next Quarterly Safety Meeting will be on Wednesday 02/23/2022 beginning at 7:00 am at Valle Vista. We will again be on the second floor in the Westview Room.

I will need all employees with job boxes to ensure they bring them to the meeting for inspection and update. Please do not forget these.

Please contact myself or your Superintendent as soon as possible if you will not be able to attend this meeting for some reason.

Thank you.

Jeremy Burke

Network Services

We are installing emergency BIOS updates on our hosts. The following services are temporarily down. Vibe, toolboxtalks, Filr, Groupwise Messenger, Groupwise Mobility, iprint, Gigatrak and Filemaker. Keep posted for updates.

Network Host

As of 6-25-21 we have a Network Host that hosts 9 of our virtual servers, therefore we are experiencing network issues, particularly for internal users. I have a critical ticket with support opened and will post updates here.

Annual CCS Drug Screen

Our annual CCS drug screen will be held on Wednesday June 23, 2021 at our Greenwood office.

Outside Plant personnel, City County, and Roche dedicated technicians will need to report at 7:00 am.

Methodist, IU, and Pendleton employees will need to report at 7:30 am.
Inside Plant personnel will need to report at 8:00 am.
T&M and DuzCart personnel will need to report at 8:30 am.
Office staff and management will need to report at 9:00 am.

Fort Wayne, IL, and FL employees will receive direct correspondence with your testing site and will need to complete testing on Wednesday June 23, 2021.

We will be serving doughnuts and beverages at this meeting. Please stop by the tables in the warehouse to sign in and collect any paperwork.

All employees will be expected to proceed to their assigned job sites immediately following testing. This is a mandatory testing procedure. If you have any questions, please contact me as soon as possible.